Wednesday, June 23, 2010
Wednesday, June 23, 2010 Carriage Pieces to Machine Shop
Today I plan to deliver the tubing and instructions to Victoria Repair so they can cut and drill the carriage pieces.  This is the last step before I will be able to put the carriage together.  There will be much to go after that, but this will be a big step, psychologically as well as actually, because I will actually have the Jetwing basically built.  There will be other work, including the throttle cabling and electrical hook-up, propeller installation, and general engine check-out.  But getting past this step will be huge.  I measured everything out meticulously and gave Victoria Repair a list of all the carriage components, side rails, uprights, side brace tube, and bent front downtube.  The side rails and uprights are sleeved, so hopefully they will do that correct.  I am doing a slight modification to the uprights; I’m going to add a full-length inner sleeve rather than duplicating the original design of three sections of sleeving.  Since the wing and engine hang on these pieces, I don’t think it’s a bad idea to have full-length inner sleeves like the side rails.  The added weight will be minimal.  We’ll see how Victoria Repair does with these components.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment